Skip to search boxSkip to navigationSkip to main content

Use of curtailed sampling plans in the economic design of np-control charts

  • William W. Williams(corresponding author)
    ,
  • Stephen W. Looney
    ,
  • Michael H. Peters
*Corresponding author for this work
  • Louisiana State University
Scholary Output:
Contribution to journal
Article
Peer-review

Abstract

An expected-cost model is developed for the np-control chart when curtailed sampling procedures are followed. The total expected cost consists of the cost of sampling, the cost of investigating and possibly correcting the process when an out-of-control signal is received, and the cost of producing defectives. A Hook–Jeeves search procedure is used to identify the minimum-cost sampling policy as a function of three design variables: Rejection number, maximum sample size, and intersample interval. Numerical examples are presented, and comparisons are made to corresponding complete sampling policies. These results indicate that curtailed sampling plans provide cost improvements over traditional complete sampling plans and are, therefore, to be recommended whenever it is appropriate to use them.

Publication Information

Output type

Scholary Output:
Contribution to journal
Article
Peer-review

Original language

English (US)

Pages from-to (Number of pages)

Pages 57-63 (7 pages)

Journal (Volume, Issue Number)

Technometrics (Volume 27, Issue 1)

Publication milestones

  • Published - 02/1985

Publication status

Published - 02/1985

ISSN

0040-1706

Publication IDs

  • Scopus: 0022011820

Publication metrics

Metrics

Scopus
citations
Fractional count
1
Fractional count
0.33
Fractional count
2
Fractional count
0.67
Fractional count
1
Fractional count
1

PlumX, opens in new tab

Citation count
14
Captures
4